DEWA approvals · Dubai
The whole approval, from one circle.
Electric Circle draws your electrical shop drawings to DEWA standard, lodges the submission, clears every reviewer comment and stays with the file through inspection and energisation. You give us the documents once.
What we do
Eight services, all of them DEWA.
Take a single item or hand over the whole package, from empty shell to energised premises.
Electrical Shop Drawings
Single-line diagrams, load schedules, panel layouts, earthing and containment drawings prepared to DEWA's current…
Read more → 02DEWA Approvals & Inspection
End-to-end handling of the DEWA submission: upload, comment clearing, resubmission, and coordination of the site…
Read more → 03Electrical Load Approvals
Load estimation, diversity and demand calculation, and the DEWA load application for new premises, so the connection…
Read more → 04Water NOC Approvals
Water connection No Objection Certificate applications and follow-up with DEWA for new premises and for changes to an…
Read more → 05Additional Load Approvals
Applications to increase the sanctioned load on an existing DEWA meter when equipment, tenancy or a fit-out pushes…
Read more → 06Single to Three Phase
Full conversion application, revised load calculation and drawings for premises moving from a single-phase supply to…
Read more → 07Fit-Out Job Approvals
Electrical approvals for fit-out works, coordinated with the landlord, mall management or free zone authority…
Read more → 08Substation Location & Size
Substation siting, room sizing, access and clearance drawings submitted for DEWA planning approval on plots and…
Read more →How it works
Four steps, and we own all of them.
1
Send us the details
Trade licence, tenancy or title deed, and whatever drawings exist. A WhatsApp message with photos of the premises is enough to start.
2
Load study and drawings
We build the connected load from your equipment list, calculate demand, and draft the shop drawing set to DEWA standard.
3
Submission and comments
The file is lodged with DEWA. We track it, answer reviewer comments and resubmit until it clears, and keep you updated.
4
Inspection and energisation
We coordinate the site inspection with your contractor, close any observations, and hand over the approval records.
On site
Work taken through to energisation.




Why clients stay
Approvals fail on paperwork, not physics.
An incomplete file, a drawing that does not match the load application, a comment nobody answered. All three are avoidable.
One file owner
Your submission is not passed between desks. One person prepares it, submits it, clears the comments and reports back to you.
Drawings and approvals together
The drawings are drafted by the same office that submits them, so the load application, the single-line diagram and the schedule never disagree with each other.
Comments cleared, not forwarded
When DEWA raises a comment we correct the drawing and resubmit. You get a status update, not a forwarded email asking you what to do.
Contractors kept in step
We coordinate directly with your electrical contractor before inspection so the premises is actually ready on the day.
Send the details, get a scope and a fixed fee.
Type of premises, location, and what needs approving. Drawings or an equipment list if you have them.