Dubai · DEWA approvals & shop drawings
Drawings that clear DEWA the first time.
Electric Circle prepares the electrical shop drawing set to DEWA standard, lodges the submission, clears the reviewer comments and takes your premises through inspection to energisation. One office, one file owner, one number to call.
Office
Office No. 2, Al Warsan 3, Bur Dubai
Open
Monday to Saturday
8:30 am – 5:00 pm
Coverage
All DEWA areas
across Dubai
Call or WhatsApp
055 645 2851
What we do
Eight DEWA services, handled end to end.
Drafting and submission sit in the same office, so the load application, the single-line diagram and the schedule never contradict each other.
Electrical Shop Drawings
Shop drawings to DEWA standard
OPEN → 02DEWA Approvals & Inspection
Submission through to inspection pass
OPEN → 03Electrical Load Approvals
Load study and connection application
OPEN → 04Water NOC Approvals
Water connection No Objection Certificate
OPEN → 05Additional Load Approvals
Increase the load on an existing meter
OPEN → 06Single to Three Phase
Phase conversion applications
OPEN → 07Fit-Out Job Approvals
Retail, F&B, office and warehouse fit-outs
OPEN → 08Substation Location & Size
Substation siting and sizing approvals
OPEN →How it runs
From your first message to an energised premises.
Send us the details
Trade licence, tenancy or title deed, and whatever drawings exist. A WhatsApp message with photos of the premises is enough to start.
Load study and drawings
We build the connected load from your equipment list, calculate demand, and draft the shop drawing set to DEWA standard.
Submission and comments
The file is lodged with DEWA. We track it, answer reviewer comments and resubmit until it clears, and keep you updated.
Inspection and energisation
We coordinate the site inspection with your contractor, close any observations, and hand over the approval records.
On site
Work we have taken through to energisation.




Why clients stay
Approvals fail on paperwork, not physics.
Most delays come from an incomplete file, a drawing that does not match the load application, or a comment nobody answered. We remove all three.
One file owner
Your submission is not passed between desks. One person prepares it, submits it, clears the comments and reports back to you.
Drawings and approvals together
The drawings are drafted by the same office that submits them, so the load application, the single-line diagram and the schedule never disagree with each other.
Comments cleared, not forwarded
When DEWA raises a comment we correct the drawing and resubmit. You get a status update, not a forwarded email asking you what to do.
Contractors kept in step
We coordinate directly with your electrical contractor before inspection so the premises is actually ready on the day.
Send the details, get a scope and a fixed fee.
Tell us the type of premises, the location and what needs approving. If you have drawings or an equipment list, send those too.