Preview V1 · Loadline V2 · Title Block V3 · The Circle ← All three concepts
SheetServices
Items08
RevA

Everything a DEWA submission needs, in one office.

Shop drawings, load studies, approvals, inspections and the awkward NOCs in between.

Electrical Shop Drawings — Shop drawings to DEWA standard
Ref01
ServiceDubai
StatusAvailable

Electrical Shop Drawings

Single-line diagrams, load schedules, panel layouts, earthing and containment drawings prepared to DEWA's current drafting standard and submission format.

We prepare the full electrical drawing set a DEWA submission needs: single-line diagram, load schedule and demand calculation, distribution board schedules, small power and lighting layouts, earthing and bonding, and cable route and containment drawings.

Drawings are drafted in the layer structure, title block and symbol set DEWA expects, so the reviewing engineer is not slowed down by formatting. Where a consultant or landlord has their own drawing standard, we match that too and issue a coordinated set.

What is included
01Single-line diagram and load schedule
02DB schedules, small power and lighting layouts
03Earthing, bonding and containment drawings
04Consultant and landlord mark-ups incorporated
05AutoCAD and PDF issue, revision-controlled
DEWA Approvals & Inspection — Submission through to inspection pass
Ref02
ServiceDubai
StatusAvailable

DEWA Approvals & Inspection

End-to-end handling of the DEWA submission: upload, comment clearing, resubmission, and coordination of the site inspection until the approval is issued.

Most delays are not technical, they are administrative. A missing trade licence copy, an out-of-date tenancy contract, a drawing revision that does not match the load application. We handle the file so those do not happen.

We lodge the submission, track it, respond to reviewer comments, resubmit, and then coordinate the site inspection with your contractor so the premises is ready on the day the inspector attends.

What is included
01Document checklist prepared before submission
02Portal submission and tracking on your behalf
03Reviewer comments cleared and resubmitted
04Site inspection coordinated with your contractor
05Approval and inspection records handed over
Electrical Load Approvals — Load study and connection application
Ref03
ServiceDubai
StatusAvailable

Electrical Load Approvals

Load estimation, diversity and demand calculation, and the DEWA load application for new premises, so the connection is sized correctly the first time.

We build the connected load from your actual equipment list, apply the correct diversity factors, and produce a demand figure that stands up to review. Under-applying means a second application later; over-applying means paying for capacity you will not use.

The calculation, single-line diagram and application are submitted together as one consistent package.

What is included
01Equipment schedule and connected load build-up
02Diversity and maximum demand calculation
03Supply type and metering arrangement advice
04Load application lodged with DEWA
Water NOC Approvals — Water connection No Objection Certificate
Ref04
ServiceDubai
StatusAvailable

Water NOC Approvals

Water connection No Objection Certificate applications and follow-up with DEWA for new premises and for changes to an existing connection.

A water NOC is often the item that holds up a handover, because it is applied for late. We prepare the application, the supporting drawings and the ownership or tenancy documentation, and follow it through DEWA to issue.

Where the premises is inside a mall, a free zone or a managed community, we deal with the landlord or authority NOC that has to sit alongside it.

What is included
01Water connection NOC application and follow-up
02Supporting plumbing and site drawings
03Landlord or community NOC coordinated
04Status reported to you until issue
Additional Load Approvals — Increase the load on an existing meter
Ref05
ServiceDubai
StatusAvailable

Additional Load Approvals

Applications to increase the sanctioned load on an existing DEWA meter when equipment, tenancy or a fit-out pushes demand past the approved figure.

New kitchen equipment, added machinery, a bigger chiller or an extra floor of tenancy all raise demand above what the meter is sanctioned for. Running past the sanctioned load is a compliance problem and an outage risk.

We calculate the revised demand, check whether the existing supply, cable and DB can carry it, and lodge the additional load application with the revised drawings.

What is included
01Revised demand calculation against sanctioned load
02Check of existing supply, cable and board capacity
03Upgrade drawings where the board must change
04Additional load application submitted and tracked
Single to Three Phase — Phase conversion applications
Ref06
ServiceDubai
StatusAvailable

Single to Three Phase

Full conversion application, revised load calculation and drawings for premises moving from a single-phase supply to a three-phase supply.

Single-phase supplies run out of headroom quickly once real equipment arrives. Converting to three phase means a new load study, a revised single-line diagram, a new distribution arrangement and a fresh DEWA application, not just a change at the meter.

We prepare all of it and coordinate the changeover with your electrical contractor so downtime is planned rather than discovered.

What is included
01Three-phase load study and balancing
02Revised single-line diagram and DB schedule
03Conversion application lodged with DEWA
04Changeover coordinated with your contractor
Fit-Out Job Approvals — Retail, F&B, office and warehouse fit-outs
Ref07
ServiceDubai
StatusAvailable

Fit-Out Job Approvals

Electrical approvals for fit-out works, coordinated with the landlord, mall management or free zone authority alongside the DEWA submission.

A fit-out usually has two approval tracks running at once: the authority, and the landlord or mall. They ask for different things in different formats, and a drawing that satisfies one will often be rejected by the other.

We produce the drawing set both will accept, submit to each, and keep the two tracks moving together so the fit-out programme is not held by paperwork.

What is included
01Retail, F&B, office, clinic and warehouse fit-outs
02Landlord and mall management submissions
03Free zone and community authority NOCs
04DEWA approval and inspection through to energisation
Substation Location & Size — Substation siting and sizing approvals
Ref08
ServiceDubai
StatusAvailable

Substation Location & Size

Substation siting, room sizing, access and clearance drawings submitted for DEWA planning approval on plots and developments.

On a plot or a development, substation position is fixed early and is expensive to move later. DEWA has requirements on room size, access for transformer delivery, ventilation, clearances and distance from the building.

We assess the plot against the projected load, propose a compliant location and room size, produce the layout drawings, and take the proposal through DEWA planning approval.

What is included
01Plot assessment against projected load
02Room size, ventilation and clearance layout
03Transformer access and delivery route
04Planning approval submission and follow-up

Send the details, get a scope and a fixed fee.

Type of premises, location, and what needs approving. Drawings or an equipment list if you have them.