MARI GOLG — Transport and General Contracting
WhatsAppCall us
Home / Pipeline

Utility Trenching

Excavation and trench preparation for water, drainage, sewerage, electrical and communication services.

Discuss your requirements
Utility Trenching
Utility Trenching

Start with the right details.

Utility trenching prepares the civil route for a proposed service. Excavation, trench formation and bedding requirements are coordinated with the utility layout and existing site conditions. Backfill and reinstatement requirements can be discussed together with the trench preparation scope.

Project application

Utility routes serving buildings, roads and infrastructure.

Service scope

  • Water, drainage and sewerage trench preparation
  • Electrical and communications service corridors
  • Trench bedding, backfill and reinstatement scope
Enquire about this service
Pipeline civil workflow

From corridor preparation
to reinstatement.

A coordinated earthworks sequence, planned around the approved route and project specification.

  1. ROW Preparation

    Clear and form the right-of-way and prepare access along the corridor.

  2. Trench Excavation

    Excavate and shape the trench according to the route and specified profile.

  3. Bedding / Pre-Padding

    Prepare the specified bedding layer before the pipeline installation stage.

  4. Pipeline Support Works

    Coordinate civil support and access with the pipeline installation team.

  5. Post-Padding

    Place specified padding around and above the pipeline as required.

  6. Backfilling

    Replace the remaining trench fill in the specified sequence and layers.

  7. Compaction

    Condition and compact the fill to the project requirements.

  8. Final Grading & Reinstatement

    Restore the surface profile, access areas and specified finished condition.

Explore pipeline civil support
Let's talk about your site

Ready for the next move?

Start a project enquiry+971 52 130 2272