Al Qusais, Dubai · Across the UAE
← All engineering topicsROCKMAX / Engineering guide

Deep foundations

When near-surface soils are unsuitable for the proposed loads, piles can carry forces to deeper strata. Selection depends on the geotechnical investigation and structural requirements.

Explore the relationship between foundation systems, excavation support and the conditions below the surface. These technical illustrations explain common methods; suitability and availability for a ROCKMAX project must be discussed individually.

Deep foundations

What this means for your project

01

Deep foundations

The foundation design considers load transfer, pile geometry and settlement criteria. Before discussing piling, gather the foundation layout, structural loading information and available borehole records.

02

Project preparation

A foundation system is chosen for the specific building, ground conditions and design requirements, not simply the size of the rig.

Four inputs that shape the scope

01

Ground conditions

Soil and groundwater information informs design.

02

Structural loads

The structure determines the required support.

03

Excavation boundaries

Adjacent properties and excavation geometry influence retaining needs.

04

Equipment access

Available working area and restrictions affect planning.

ROCKMAX / PROJECT INSIGHT

A closer look

Shaft resistance and base resistance

A pile can mobilise resistance along its sides and at its toe. Engineers assess the relative contribution using ground investigation data and design criteria.

Settlement considerations

Foundation performance involves both load capacity and movement under service conditions. The designer assesses expected settlement and compatibility with the supported structure.

Project-specific verification

Pile geometry, materials and required verification depend on approved specifications; these guide notes do not replace engineering advice.

Reference reading

Geotechnical method reference ↗Further reading on deep foundations ↗
WhatsApp