Contiguous pile walls

A row of closely spaced piles supports soil along an excavation perimeter. The gaps mean separate groundwater measures may be needed.

Explore the relationship between foundation systems, excavation support and the conditions below the surface. These technical illustrations explain common methods; suitability and availability for a ROCKMAX project must be discussed individually.

Contiguous pile wall

What this means for your project

01

Contiguous pile walls

The required support arrangement depends on the ground profile, excavation sequence and the sensitivity of neighbouring structures.

02

Project preparation

Discuss the proposed excavation dimensions, nearby assets and the available geotechnical report.

Four inputs that shape the scope

01

Ground conditions

Soil and groundwater information informs design.

02

Structural loads

The structure determines the required support.

03

Excavation boundaries

Adjacent properties and excavation geometry influence retaining needs.

04

Equipment access

Available working area and restrictions affect planning.

ROCKMAX / PROJECT INSIGHT

A closer look

Closely spaced piles

Contiguous pile walls consist of closely spaced piles with gaps between them. The design addresses retained ground, structural loads and any treatment required between piles.

Water and soil conditions

Gaps can allow water or fine soil to pass depending on the ground and detailing. The project engineer assesses the need for supplementary measures.